In view of the basketball court construction drawing requirements, perhaps because of price issues, some customers have chosen a basketball court fence installation plan with nets hanging on columns and beams on the site. The correct construction method for this device plan is to first fix one column A, then fix the second column B, then install the measurement, and then continue the netting operation.
When this piece is done, the third pillar C is fixed, the fence between B and C is fixed, and so on. When installing the column, do not use the iron pliers to swing the connecting groove to avoid damage to the outer protective layer forming the fence.
During the construction and maintenance of the cement chip layer, all the embedded parts shall be completely installed. When the ground floor is leveled during construction, the embedded parts shall be fully embedded according to the planning requirements of the drawing. The embedded depth is 120mm, the fence posts are specially embedded.